Support the PM, project engineers and team members in planning, scheduling of tasks and developing integrated construction documentation
When requested, review the shop drawings and submittals of the structure profile submitted by the consultant and contractor
Support site inspections and assessments and prepare subsequent comments and reports
When requested, prepare and maintain sketched, maps, reports and descriptions of surveys in order to describe, certify and assume liability for work performed
Assist the PM in verifying the accuracy of survey data, including measurement and calculations conducted at survey sites
Support/review surveys in order to establish boundaries for structure and road
Document the results of Surveys, including the shapes, contour, location, elevation and dimensions of land or land features
Review the calculations of heights, depths, relative positions, property lines and other characteristics of terrain
Prepare preparation of all data, charts, plots, maps, records and documents relate to surveys
Review the fixed points for use in making maps, using geodetic and engineering instruments
Job Specification
Bachelor’s degree in Surveying and Geomatics Engineering from a reputable University
A professional or technical diploma with additional 2 years of relevant experience may be accepted in lieu of the education requirements outlined above
Minimum 2 years of progressively responsible experience, related to hydropower, Road or Transmission line
Proficient in the use of computers and office software packages (MS Word, Excel, Access, PowerPoint)
Knowledge and skills in using AutoCAD and GIS is required
This Job is expired. The Company is no longer accepting applications for this position.
Organization Summary
Kasuwa Khola Hydropower Ltd (KKHPL), is a public company incorporated on Kartrik 30, 2067 (November 16, 2010) as per Company Act 2063, Nepal with the objective to develop and invest in hydropower projects. It is currently developing 45 MW Kasuwa Khola Hydropower project in Sankhuwasabha District and owns its electricity generation license. The project is located in Makalu Gaupalika, of Sankhuwasabha District. Its registered office is located at Tripureshwor -11, Bluestar Complex, Kathmandu, Nepal. CEDB Hydro Fund Limited (CHF) holds sole ownership in the company.